Starting Price
€130,000
Price List
Description
Details
- Contract For Rent
- Location New York, USA
- Year Built 1988
- Rooms 3
- Beds 4
- Baths8
- Gadgets 6
- Home Area 30sqft
- Lot Dimensions 30*30*20 ft
- Lot Area 50 ft
These apartments for sale in Oba are an excellent opportunity to invest, as they are located in a quiet area filled with amenities at a reasonable price.
Reasonably Priced Apartments for sale in Oba
These apartments for sale are located in Oba, which is known for being the closest area to the city center. Only 1.8km away from the sandy beaches of Alanya. What makes the complex special is not only its distance to the city but away from all of the chaos that comes with living in the city center.
Distance from Amenities
- It is 30 km from Gazipasa airport.
- It is 300 m from the junction, 1.8 km from the sea.
- 3.5 km from ALKU University hospital and Metro Market. There are also well-established educational institutions in the environment.
Project Features
- Even though there are three blocks in this project, only A and B blocks are for sale.
- Each block has its own outdoor swimming pool and facilities.
- The Garden duplexes have a wonderful porch, which will most likely be the first ones to sell as they offer a great living area.
- On the south side of the buildings, you can see the sea, city, and castle.
- The project is in a quiet surrounding.
Types of properties for sale
This complex comes with three blocks that consist of 72 apartments. In these structures, there are two types of apartments for sale;
- One-bedroom apartments with 45sqm of space with one balcony and one bathroom.
- Two-bedroom garden duplex apartments with a minimum of 79sqm of space with two bathrooms and two balconies. Also, the gardens will consist of a minimum of 39sqm.
One of the three, two-bedroom garden duplex apartments will consist of an 80m2 interior space while having a stunning 61m2 garden
- Two-bedroom penthouse apartments with a 128m2 interior space consist of two balconies (including terrace) and two bathrooms.
Date of completion: March 2022